Installation of Pipe Stools, Gas Dispensing Unit, and Integrated Gas Handling Facility (IGHF) Phase 2

Scope: The project involved the installation of pipe stools, a gas dispensing unit, and the construction of an Integrated Gas Handling Facility (IGHF) as part of Phase 2 development in OML 111, Ologbo, Edo State, Nigeria.

Objectives:

  1. Enhanced Gas Handling Capability: The primary objective of the project was to enhance the gas handling capabilities in the OML 111 area. This would enable the efficient and safe processing, separation, and handling of natural gas produced from the field.

  2. Increased Operational Efficiency: By installing pipe stools, a gas dispensing unit, and an integrated gas handling facility, the project aimed to streamline gas handling processes, leading to increased operational efficiency and reduced downtime.

  3. Improved Safety Standards: The implementation of the gas handling facility and associated equipment aimed to enhance safety standards during gas transportation and processing, protecting both workers and the surrounding environment.

Project Reference: Installation of Pipe Stools, Gas Dispensing Unit, and Integrated Gas Handling Facility (IGHF) Phase 2

Client: Nigeria Exploration and Production Limited (NEPL)

Project Location: OML 111, Ologbo, Edo State, Nigeria

Project Duration: 2019 - 2020